The plank floor does not lose its relevance to date. The boards are laid directly on the beams, if the step between the beams is too wide, the lags are additionally laid. The optimal step between the beams is selected in the thickness of the boards, in any case there should be no deflections and stagger.
Want to change the design of the porch for a long time, but you don’t know which one is best to choose? Choose it will help you the site is worth their services inexpensively.
The wooden floor is laid with a zero bias, so the level of beams are leveled using wedges. Do not abuse various chips and wedges without proper fixation of inserts, t. To. With vibration, they can fall out. It is best to use sand, covered in sagging places for alignment. When laying the lag on the concrete base, the use of antiseptic gaskets is required.
The first board is attached with nails to each lag, the hats are slightly. The resulting holes are disguised as putty. The next board is laid using a crushed downshole bar. Glining is carried out using an stop into a metal bracket. The technology of styling using cringing is called the release. With high -quality installation of the plank floor, the gaps do not exceed 1 mm.
Milling boards differ in high evenness and density. Paul with boards of this type is less susceptible to deformations at moisture and temperature drops. The presence of periods in the lower part of the boards ensures the possibility of natural ventilation of the inter -hairspace, the same recesses increase the contact of the boards with the lags.