Skip to content Skip to sidebar Skip to footer

Installation of the bathroom.

Installation of the bathroom. Just a master

Welcome to the pages of the construction portal – just a master! Here you will find information on the following topics: repair, construction, construction companies, interior, design, layout, private houses, apartments, new building, cottage, cottage, apartments, building materials, tools, furniture, windows, doors, floors, ceilings, walls , basement, foundation, bathroom, sewage, heating, air conditioning, electrical wiring, lighting security systems, roof, equipment, loans and loans, mortgages…

Archive

Installation of the bathroom.

The installation of the bathroom is a rather painstaking process. It requires a lot of patience, because the bath should be stable and not proceed. The bathroom installation largely depends on the choice of the bathroom (steel, acrylic, cast -iron) and the method of its installation (on legs or brickwork).

Step -by -step installation of the bathroom.

Should start with the dismantling of the old bathroom. To do this, disassemble the drain – the pipe connecting the bathroom to the sewer lounger. The Bulgarian will help to cope with a cast -iron drain, a hammer and a chisel – a hammer. Then it is necessary to knock out the legs from under the bathroom from the outside and, tilting it to one side, remove it from the “planted” place.

Then you should clear the place to install the new bathroom, assemble the strapping according to the instructions and smear the joints with sealant. After that you can insert the drain into the bell, or “put it” in a special cuff (if a cast-iron bunker).

After that, you should begin directly to the installation of a new bathroom. To do this, it must be placed in the prepared place, tilted from the wall, attach long legs to it, then – near. It is important that the bathroom is stable and does not stagger. To do this, you can adjust the rise of the legs using bolts or a special built -in mechanism. Brick masonry is best suited for installing cast iron bathrooms.

The next stage of the installation is the fastening of the strapping. Its rings must be fixed using bolts on the front side of the bathroom. Then you should connect the corrugation and strapping through the cone -shaped gasket. At the end, you can check the bathroom for tightness, pouring a little water into it and putting sheets of paper under the drain pipe. If everything is in order, the installation of the bathroom can be considered successfully completed. Next, you can start decorative decoration of the bathroom.

We advise you to familiarize yourself: