How should the repair begin? At a minimum, from what you need to determine: what exactly are you going to do. There is a sad, but quite fair saying: “The repair itself never ends. It can only be forcibly completed “. Because initially you plan to change the door and glue new wallpaper, then you decide that you need to whitewash the ceiling, change the radiator, and it ends with the fact that you begin to cycles of the floors.
But if you really want the repair to end, start by drawing up a list of work.
Only in this case you can limit yourself only to these work, and only in this case you can plan the sequence in which everything needs to be done. Because sometimes it happens that you first install door blocks with platbands, and only then remember that you were going to do wiring.
After the list of work is defined, free the room.
Ideally, you need to take out all the furniture
At worst – cover everything with a film so that dust, sawdust, paint do not get on furniture. If you are not going to change the flooring, then do not forget to protect it: cover it with sheets of packaging cardboard, and on top with a thick plastic film.
After that, throw off all the garbage: old pipes, soda wallpapers, radiators – in a word, everything that you no longer need.
After that, you can align the walls, laying the wiring, perform the necessary welding work, install radiators, switches and sockets, sanitary units.
We insert the door box
Now you can insert a door frame and change the windows; It is better not to hang the door itself until the end of the wall decoration. Installation of slopes and accessories is carried out after the end of the wall decoration.
In what sequence will you engage in surface decoration – this is your own business, but it is still better to “figure out” the ceiling first. After all, the installation of a suspended ceiling or painting of the ceiling can harm (and damage how much you try to be neat) walls and floor.
If you want to fit the wall coatings as accurately as possible, remove all the upper lids of the electric shock. The last touch will be the fixing of skirting boards and platbands (by the way, remember that under them you can immediately carry out the necessary wires), installing the door leaf.
It remains to hang curtains and a chandelier, shelves and paintings, install furniture – and you can “enter” into the room. And – start planning repairs in the next room.