Skip to content Skip to sidebar Skip to footer

Repair in the bathroom

I am a new person in the field of repairs, but after passing the full cycle of work in my apartment I already know a little “what’s how much”. By virtue of my unexpectedness, I share what I have heard and lived.

Many people (among them were also me) do not always imagine where to start repairs at all. It is good that most often people who have (passed through the well -known “screed, welding and copper pipes” come to the rescue; well, or as in the original?). Such for me was my parents and mother -in -law, a godfather, a professional repair master?. So, you need to start from the place where it will be possible to type water for work and drain the spent materials after the bathroom done – the bathroom.

As in the whole house, before starting work, it is necessary to clearly imagine and think through the location of furniture items. Most often in the list of necessary plumbing “Masthev” (could not resist the smart word ?) includes a toilet, a cabinet with a washbasin, a cabinet with a mirror, a bath, a shower cabin or a hydromassage box (which more likes) and, if there is enough space, a washing machine. You may need to repair Bosch washing machines. If you think that even trifles cannot be missed, I also recommend buying a heated towel rail and take a cabinet with backlight and outlet (extra connectors, especially in the bathroom).

As soon as you first have an imagination, and then on paper, a measured and verified plan for placing the above items will be displayed, you need to buy and lay pipes and wires. The most common ways to lay communications are through the ceiling and on the floor. The first type is used when the second one cannot be applied: the floor is already pulled out or there is a chance of damage to communications when laying on the floor. The reasons are very different.

Another useful point that you need to take care of at the very beginning of the alterations is a system of valves for different mechanisms that consume water. For example, there is one valve for a bath and a toilet, for kitchen needs – another, and pr. This is necessary for a simple overlap of water in case of breakdown of a certain machine. Agree, it is more convenient to block only part of the access, and not all the water in the apartment.

As soon as the wires and pipes are over, you can proceed to the tile. First of all, it needs to be laid on the floor pre -aligned by screed. I advise you to take a little dark tile with a matte surface, so as not to turn your neck, leaving the bathroom and stepping with wet legs. Believe me, the rug does not always save?. As soon as the tile on the floor grabbed, you can work with the walls. For the aesthetics of the type of pipe bred, use special round incisors for tiles. They will help make a beautiful even neckline.

In line – our height. The ceiling is made the most different: from drywall plates to stainless profiles – which is affected and to taste. But for security reasons, I recommend taking a rack ceiling. It is resistant to moisture and more practical to use.

After setting the door. Since the tile has the ability to crumble, it is better to buy a door restriction at each other. He will not give the door to fight hard against the walls. And better choose the door that opens into the room. Well, with the technique, you already watch yourself. Advertising has not yet been paid?.

High -quality repairs to everyone!