Features of installation of split systems

Today, split systems are quite popular among the population. And there is nothing surprising here, because this technique is characterized by functionality and high quality. However, the key to her successful work is competent installation. Consider the main nuances of the installation.

Preparation

Initially, you need to decide where exactly the internal and external block will be located. It is important to make sure that they are so that they do not interfere with nearby objects, as well as to each other.

In addition, blocks should remain accessible to humans. This will be required for their repair or maintenance.

Installation of the outer part

As practice shows, the installation of the air conditioner in Sochi is best done during the repair process. At the first stage of installation, the external unit should be set. To do this, the walls are spoiled, relevant communications are laid, electrical wiring is carried out.

Do not forget that the air conditioner consumes a fairly large amount of electric energy. Thus, if you want to save the main electric circuit from the loads, you will need a separate wiring line and a special switch.

To choose the right site for attaching equipment, you need to think over the need for its regular maintenance.

For example, it is worth taking care of such moments:

Protection against dirt.

Seduction protection.

Snow protection.

The optimal solution is the arrangement of an ordinary visor.

Installation of the inside

As for the place for the installation of an internal unit, this issue should be guided by the need to ensure normal and non -stop circulation of air flows. It is forbidden to mount a block at a distance of less than ten centimeters from the ceiling or above large case furniture.

It is important to carefully take into account the direction of the stream of cool air. Do not mount the air conditioner so that the air is directed to where people often rest (sofa, desktop, etc.).

On the area where you are going to install an internal unit, there should be an opportunity for normal laying pipelines and electric cables. Do not forget about the need for regular maintenance. Thus, the block should always remain in the zone of normal access.