The installation of a bath is not a complex process: modern plumbing equipment, fasteners, communication systems greatly simplify installation work. Before installing the bath, it is necessary to carry out preparatory work, make accurate measurements and stock up on the right tool. When choosing a bath, the dimensions of the doorway are taken into account so that there are no subsequently difficulties with the drift of the product.
Description of the article:
Stages of installing a bath
Fixation of brackets
Pay special attention to the equipment, the height of the legs, the shape of the bottom, the size and features of the connection to the sewage system and the water supply. Preparatory work before installing a bath 1. Dismantle old equipment, remove lining.
Stages of installing a bath
2. After leveling the floor, laying tiles or other finishing work to wait to complete the walls and floor. 3. Install water distribution networks. If the plastic pipe is laid in the strobes, then all the work must be carried out before the wall cladding. 4. Determine and check the sewer. DIY bath recommendations 1. Remove transportation material from the bath, carefully put it into the room, put it upside down for convenient assembly work. 2. Install the supporting brackets, handles (if they are included), sewer siphon and overflow. During the assembly, it is advisable to open all the rubber seals with a sealant, the excess of which is then removed by a rag.
Fixation of brackets
In view of the fact that the bathtub filled with water has a large weight, special attention is paid to reliable fixation of the brackets. 3. After the assembly is completed, the bath is turned into a working position and installed in a prepared place. The next stage is the level of level. If the brackets are adjustable, then the desired height is achieved due to changes in the depth of the bolts, cast or stamped brackets are stuck to the desired height by a grinder. For reliability, it is recommended to glue the legs of the bath to the floor with a special solution.
4. The final stage of the installation of the bath with your own hands is to connect the siphon to sewage, checking the stability of the bath, the tightness of the rubber seal. Then the gap between the edge of the bath and the wall is sealed.