Correct installation of an external air conditioner unit: the key to his long service life

High-quality installation of climatic equipment, split air conditioning systems-a competent installation of its blocks and the installation of pipes, which will flow gas Freon responsible for cooling. The next step is to create holes in the wall using a drill and the equipment of the drainage system, according to which condensation will drain. Then – installing electronics and delivering freon pipes from air. And the last stage is a test check of the functional abilities of the air conditioner.

It is necessary to mount the compressor (external part) not on the balcony, but outside the window, so that it can easily reach it (in order to prevent breakdowns). Otherwise you will have to use the services of an industrial climber, and this is expensive. When installing a split system yourself, know that its outer part should be attached at a distance of ten centimeters from the wall-no less, t. To. If you fix it back to the wall, then in the summer the compressor will certainly overheat and fail. When the installation of this climatic equipment is carried out by professionals – make sure that this requirement (10 cm from the wall) is fulfilled.

A process such as a high -quality installation of the air conditioner in the apartment involves its purchase in a time -tested store. One of these is KlimatProff. There you can also purchase all the goods accompanying the installation process. During this kind of work, it is important to use high -quality brackets, bolts, mounting plates). For them, special holes are created in the wall. The mounting plate should be very durable, easily withstanding the weight of not one, but two compressors.

Proper installation involves the mandatory installation of the visor above the compressor of the air conditioner. He will save the external block from rain and snow. If the air conditioner is supposed to be installed on high floors, they call climbers (the price of their services is from 60 to $ 150). Living on the last floors can install the outer part of the split systems directly on the roof, but so that the difference between the height of the “street” and the inner block is small (not more than 3 meters).

Attaching the “street” part to the walls of sandwich panels or on houses with a metal roof, it is important to make a separate foundation for an external unit, otherwise you cannot avoid strong noise and vibration during the air conditioner. The foundation should consist of vibration spokes and special stands. These goods are sold at retail outlets that sell climatic equipment.