Skip to content Skip to sidebar Skip to footer

Ceiling – plaster or make a suspension system

During the repair, a variety of work can be carried out regarding the finish of the ceiling, walls and floor. The difference between finishing technologies is simply colossal.

I want to buy a site in Priozersk for a long time, but do not know where to find them? We advise you to visit this site and there they will help you choose a good site.

For comparison, you can take the ceiling finish by painting with preliminary plastering and finishing by organizing a suspended ceiling. In the first case, the preparatory stage is very laborious. First you will need to remove the old ceiling coating, then align or local correction of defects, and after you can start puttying.

Well, this is not all, because after the putty, the resulting layer will need to be polished first, but only then primed and paint. As for the arrangement of a suspended ceiling, then no preparatory work is needed at all, at least related to the correction of defects in the old ceiling. Here you need to derive the level, and then build a frame from a metal profile or from wooden planks.

Next, you will need to do communications that can be hidden directly in the niche between the ceiling base and the new ceiling. By the way, thanks to this possibility, you can easily organize modern lighting. After that, it will be necessary to sheathe the frame with a drywall, which will need to be thrown, and then primed and painted.